Cost & Labor
Overview
We took delivery on 12/15/2017 and started the build on 12/20/2017. We’ll update this page as we progress.
Updated: 2/16/2018
[ebs_progressbar type=”default” value=”25″ barstyle=”progress-striped active” label=”BUILD PROGRESS” label_style=”outside”]
Total Build Cost$4,044.63 |
Total Labor49.50 Hours |
||
---|---|---|---|
Audio | $770.52 | Audio | 7.5 Hours |
Electrical | $311.61 | Electrical | .5 Hours |
Exterior | $331.67 | Exterior | .25 Hours |
Garage | $53.90 | Garage | 0 Hours |
Interior | $2,533.60 | Interior | 24.75 Hours |
Plumbing | $43.33 | Plumbing | 0 Hours |
–
Audio
Build Cost$770.52 |
Labor8 Hours |
||
---|---|---|---|
Headunit Install | $640.36 | Headunit Install | 6 Hours |
Subwoofer | $130.16 | Subwoofer | 2 Hours |
–
Electrical
Build Cost$311.61 |
Labor.5 Hours |
||
---|---|---|---|
Solar Panels | $0 | Solar Panels | 0 Hours |
Batteries | $0 | Batteries | 0 Hours |
Lighting | $65.98 | Lighting | 0 Hours |
Inverter | $0 | Inverter | 0 Hours |
Battery Charger | $0 | Battery Charger | 0 Hours |
Shore Power | $18.76 | Shore Power | .5 Hours |
Wire, Connectors, etc. | $226.87 | Wire, Connectors, etc. | 0 Hours |
–
Exterior
Build Cost$331.67 |
Labor.25 Hours |
||
---|---|---|---|
Fan Installation | $325.20 | Fan Installation | 0 Hours |
Window Tinting | $0 | Window Tinting | 0 Hours |
Misc Hardware | $16.22 | Misc Hardware | .25 Hours |
–
Garage
Build Cost$53.90 |
Labor0 Hours |
||
---|---|---|---|
Air Compressor | $0 | Air Compressor | 0 Hours |
Repair Stand | $0 | Repair Stand | 0 Hours |
Bike Mounts | $53.90 | Bike Mounts | 0 Hours |
–
Interior
Build Cost$2,533.60 |
Labor41.75 Hours |
||
---|---|---|---|
Insulation | $801.91 | Insulation & Sound Deadening | 16.75 Hours |
Walls | $0 | Walls | 0 Hours |
Flooring | $371.67 | Flooring | 7 Hours |
Bed | $282.86 | Bed | 7 Hours |
Cabinet | $0 | Cabinets | 0 Hours |
Overhead Cabinet | $0 | Overhead Cabinets | 0 Hours |
Seats | $877.76 | Seats | 8 Hours |
Toilet | $66.54 | Toilet | 0 Hours |
Window Covers | $28.99 | Window Covers | 2.5 Hours |
Misc Hardware | $33.72 | Misc Hardware | 0 Hours |
–
Plumbing
Build Cost$43.33 |
Labor0 Hours |
||
---|---|---|---|
Sink | $13.08 | Sink | 0 Hours |
Fresh Water Tank | $0 | Fresh Water Tank | 0 Hours |
Grey Tank | $0 | Grey Tank | 0 Hours |
Pump | $0 | Pump | 0 Hours |
Water Filter | $0 | Water Filter | 0 Hours |
Pump | $30.25 | Pump | 0 Hours |
Outdoor Shower | $0 | Outdoor Shower | 0 Hours |
Tubing & Fittings | $0 | Tubing and Fittings | 0 Hours |
It’s important to note that these are all the material costs and labor spent doing the conversion but does not include the hundreds of hours spent planning, researching and shopping.
Disclaimer: All parts and material costs are captured in the Build Costs. Labor represents the total time spent of ours to build the van. If we both worked for an hour then it will be logged as 2 hours.